How to connect Master and Slave bollard
Please look at the wiring diagram how to connect Master and slave bollard:
Also some programming is needed:
In this case you just install photocells for master bollard.
Related Articles
Bollard remotes adding and erasing
Please find all the instructions for adding and erasing bollard remotes:
How to connect LMP+ wire on Bollard
On next picture you can see where to connect LMP+ wire when installing bollard:
How to connect Photocells to Bollard
You should have two photocells and two transmitters per bollard. Transmitter is just for signal and it is battery driven, you should only install batteries inside and close cap. In the instructions there are wires but it is not necessary in your ...
Bollard power Voltage and Power draw
The bollard operates on a 230V power supply, which is the standard mains voltage across Europe. If you are in the United States, where the standard mains voltage is 115V-120V, we provide a transformer/voltage converter. This device ensures the safe ...
Installing the Control Box for Bollard
The Bollard package includes a control box, which must be installed outside the bollard at a minimum height of 200mm above ground. The control box connects to the bollard via a 6-meter cable. Here’s how the cable setup works: Connection Points: One ...