Electrical Connections for Installation

Electrical Connections for Installation

Before proceeding with the physical installation of the chain system, it is essential to prepare the power supply connections.

1. Power Supply to Master Unit

The primary connection involves supplying power to the master unit. Use a 230V-50Hz power source (or 110V-60Hz for installations in regions using the US power grid).
Connection terminals are clearly labeled on the diagram:

  • F – Phase

  • N – Neutral

  • Ground – Marked with the standard ground symbol

You can see the image of the Parklio Chain power supply to master unit connectors at the following link: https://file.parklio.co/file/pawnaf1a5e5c237ef4050ad6f634fddf45604

2. Motor Connection to Slave Unit

The slave unit contains only the motor and operates in sync with the motor in the master unit. To enable this simultaneous operation, you must connect the terminals marked + and - for Motor 2 on the master unit to the corresponding + and - terminals on Motor 2 in the slave unit.
Refer to the provided diagram for the exact position of the Motor 2 connections in the master unit.


You can see the image of the Parklio Chain motor connection to slave unit connectors at the following link: https://file.parklio.co/file/pawna8f5fb32a54db4559b8349b6b4dbf2372

3. Cable Size Requirements for Motor 2 Connection

The cross-section of the cables used for connecting Motor 2 depends on the distance between the master and slave units:

  • Up to 5 meters: Use cables with a minimum cross-section of 1.5 mm²

  • From 5 to 18 meters: Use cables with a minimum of 2.5 mm²

  • For long distances (18–20 meters): Use cables with a cross-section of at least 5 mm²

Recommendation: For optimal performance and simplified installation, we recommend using 2.5 mm² cables for all distances except for long-distance connections (above 18 meters), where 5 mm² cables should be used.

Ensure all cables are suitable for outdoor use and comply with local electrical codes and safety standards.

    • Related Articles

    • Parklio Chain Electrical Connections - Wiring Diagram

      You can also find the Parklio Chain wiring diagram at the following link: https://file.parklio.co/file/pawna5c002f27a98c4c56bdd8d84e7101c186
    • How to install Chain Column

      Instructions for installing Chain column: 1. Screw in for 1,5 - 2,0 cm the 4 screws M10x70 in dotation to the base. 2. Place the base on the previously prepared base of cement (Fig.3) 3. The upper part of the base should be clean and perfectly ...
    • Slave Unit Does Not Fully Close – Power Supply Cable Check

      If the slave unit of the Parklio™ Chain Barrier does not fully close, the most common cause is an insufficient or incorrect power supply cable between the master and slave units. Possible Cause The slave unit may not be receiving enough power due to: ...
    • Chain Installation Guide: Power Supply, Master/Slave Setup & Photocells

      Before installing the Chain unit itself, it is necessary to complete the power supply installation and connect the master and slave units according to the instructions provided in the user manual. Proper preparation ensures smooth operation and ...
    • Parklio Chain - Possible Problems And Solutions

      Type of problem Probable cause Solution On activating the opening command the automation does not move. Lack of electrical power supply Check the presence of the electrical voltage and all the connections to the electrical network. On activating the ...