Instructions for installing Chain column:
1. Screw in for 1,5 - 2,0 cm the 4 screws M10x70 in dotation to the base.
2. Place the base on the previously prepared base of cement (Fig.3)
3. The upper part of the base should be clean and perfectly horizontal.
4. Pass the plastic tubes of the cables through the central opening on the base and check again the stability of the base.
5. Unscrew the 8 screws [10] take off the frontal [8] and the rear cover [9] of the column (Fig. 4 )
6. Place now the column structure on the base.
7. Fix now the column to the base with the 4 washers [5] and 4 nuts [4].
8. Fix the frontal covers [8] of both columns with 4 screws [10].
9. Now you can fix the chain to the apposite holes on both columns respecting the level X in the middle of the chain barrier indicated at the table on page 1 (Fig. 5)
Please note that installation cables are not included with the product as the appropriate cable length varies depending on the specific requirements of your installation site. To ensure a seamless installation, we advise consulting with your installer or a qualified professional who can accurately assess and calculate the appropriate cable length required for the Chain installation at your specific location.