Bollard Installation - Standard Model

Bollard Installation - Standard Model

Please be aware that all installation instructions have to be respected for your warranty to be valid.

You can see the image showing bollard installation scheme (standard model) at the following link: https://file.parklio.co/file/pcxw7cb877582559643b8b09b7ed340b7d142

A - Sewer
B - Sand
C - Cement

The pre installation process involves digging a hole, installing drainage for water runoff, threading the cable conduit, pouring concrete, adding sand, and finally, filling the upper part with concrete again.
The bollard comes preassembled with its own cable, and this same cable must be threaded into the control box. If it happens to be too short (not sufficient for the 6-meter length), we splice it and extend it to reach the control box.



Power cable of the Parklio Bollard can not be in the direct contact with the soil and a protective conduit must be used for the underground cable passage!

You can see the image showing bollard's power cable placement (standard model) at the following link: https://file.parklio.co/file/pcxw75d6ba61a13ab43398e9b7392d8bae4c1