Automatic Learning Process

Automatic Learning Process

Automatic learning process is always done in our factory together with all other tests and functions. 

In case of necessity, automatic learning process is done like this:

1. Press MENU for 1 sec. until it appears P0 .
2. Press MENU once until it appears AU .
3. Press MENU to start automatic programming. The following
maneuvers will be carried out:
1. Closes in slowdown
2. Opens 4 sec. at normal speed.
3. Closes in slowdown
4. Fully opens at normal speed.
5. Closes 4 sec. at normal speed.
6. Opens in slowdown.
7. Closes total at normal speed.

    • Related Articles

    • Bollard Clicking But Not Moving

      Check that the Bollard is not in manual mode Check that there is power on the bollard Do the Automatic learning process
    • Bollard Does Not Work With The App

      Perform the standard reset procedure Check if the customer or technician can hear a clicking noise when they give a command with the app Check if the light on the Brain is working correctly (it should be red and turn green when you restart the brain) ...
    • Bollard Remotes Adding, Erasing and Programming

      Please find all the instructions for adding and erasing bollard remotes: You can find the image of the programming instructions of Remotes on Parklio Bollard at the following link: https://file.parklio.co/file/b5y7xc3ffdc91ca4441d4914184817417ac7a ...
    • Bollard Solar kit - Electrical Connections and Junction Box

      Junction box mounting Mount the Junction box vertically on a non-flammable substrate, with the electrical terminals facing downward. The Dimensions drawings chapter of this manual contains a dimension drawing of the solar panels and Junction box. ...
    • Bollard Installation - Standard Model

      Please be aware that all installation instructions have to be respected for your warranty to be valid. You can see the image showing bollard installation scheme (standard model) at the following link: ...